8/24/2023 0 Comments Download abrasive![]() The product shall be removed from QPL until test results confirm the product meets SSPC-AB 1 requirements. The manufacturer shall be responsible for costs associated with testing required to confirm correction of nonconformities. If verification testing finds the material out of compliance, the manufacturer is notified, and has 2 to 3 days to supply replacement conforming product to the customer and to AMPP with laboratory test verification of conformance. The verification testing may include any or all the tests required by AB 1 at our discretion. The sample may be obtained from the field by us, by the contractor, or by the owner. ![]() We reserve the right to obtain samples of unused qualified media for verification testing during the certification term.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |